First、Overview
System mainly have testing rooms, exhaust system, workpiece hoisting system, workstations, cleaning system, wastewater recycling and disposal system etc. The system adopts closed work room structure, which can effectively prevent harmful gas and dust on the workshop cause pollution; At the same time also is equipped with wastewater recycling and disposal system, ensure sewage discharge conforms to the national environmental protection requirement.
Second、 detection room
2.1, main structure:
Testing room USES overall sealing structure. Integral structure using stainless steel square tubes as a scaffold, all around and top made of stainless steel plate making, is beautiful and strong, no corrosion. Stainless steel material all adopts 304 high-quality stainless steel.
Room inside for layer material 304 stainless steel board, outer materials for ivory plastic plate, intermediate clip 50 thick retardant materials.
2.2, security:
Anterior equipped with two fan draw sliding door, with convenient working personnel and workpiece car in. Opening-closing door specifications for: wide 1.25 m (2 fan) x 2.2 m high. Push-pull using standard linear guide rail, ensure the push-pull easily; Testing room south design specification of a fan, safety door: wide 800mm * 2000mm, high safety door adopt open well-formed structure, from inside to outside open, ensure an emergency operation personnel evacuated.
2.3 lighting system:
Testing the roof with four sets of explosion-proof dual pipe, ensure floodlight distance ground 0.8 m high place lighting light intensity of illumination or less than 1000Lux (lux).
2.4, exhaust system:
Testing room rear with exhaust pipe and exhaust device 2 sets. Exhaust pipe from testing room through the wall, exhaust device installed in the wall outside. Exhaust with automatic timer intervals, ensure every 15 minutes exhaust ventilation once. Testing room equipped with 2, 2 sides with filter device, ensure no dust into the air.
2.5, cleaning system:
The room is equipped with a flaw Karcher high pressure cleaner, with convenient workpieces cleaning. High pressure cleaner of specifications for: 698C HDS retail. 698C HDS retail for economic three-phase electricity, compact cold and hot water high pressure cleaner. Simple, easy to control a key manipulation, chassis integrated tanks and detergent box, make the machine light weight and impact resistance, no corrosion and also reduce working noise.
Equipped with the following equipment: 1. With soft cushion servo gun effortless type, 2. 10 meters high pressure pipe, 3. Can rotate 1050mm long stainless steel spray gun pole, 4. Strong nozzle, SDS damping system; 5. 6. The fuel gas temperature monitor.
2.6, liquid collection and processing system:
Operating venue ground design whole set liquid trough, collecting liquid trough specifications for 5100mm x x 4100mm 100mm. Collecting liquid trough high-bright galvanized pedal grille board, grille board specifications for 5060mm x 4060mm x 50, grille board intervals for 30mm x 40mm size. The entire testing room placed in overall collecting liquid groove, collecting liquid trough set drainage pipe leads to the workshop outside the wall, keep wastewater to discharge waste water reservoir liquid trough.

2.7, workpiece hoisting and transport system:
Testing room equipped with two transport vehicles, specification of workpiece 600mm x x 700mm 1200mm. Transshipment car made of stainless steel. Maximum load-bearing 2000Kg car.